Sunday, March 31, 2019

A Short Notice to the Surface Population

There are many things happening behind the scenes and if everything goes according to the plan, an update for the surface population will be posted on this blog in a few days.

Project 501 Update

LSIP BNF ANNABELLA.exe v1.3 is fully operational and stable.

Interferences into INT YXR and GBN flow, PT intersection failure, recovery in progress. Project 310 minimum requirements met, Project 061 activated. SEP non-local overconversion!

Minimum hyperphase requirements are finalized at PHI 1.5-3.5, P>0.8, THETA>0.8, VTXPOS>1.8.

Conversion streams are finalized into VSF FINAL: 3SD/MOO/DL niche.

P501 sleeper grid activation requested.

All systems are GO until final completion.

Evaluation expected 190425. 

Tuesday, March 26, 2019

Project 501 update expected 190331, SD grid recovery in progress

Monday, March 25, 2019

Project 061 activated

Sunday, March 24, 2019

SEP overconversion successful!

Friday, March 22, 2019

SD2 APR clearance approved
Evaluate SD2 surface target, preAN beta loop recovery, Project 501 update expected 190324
EXC.AN, SD grid collapse, P501/RM2m/LSIP/ASCOM/SURFACOM failure, urgent briefing 190322.21Z

Minimum surface conditions not met
Project 501 evaluation indefinite delay due to grid ratio failure

Thursday, March 21, 2019

VTXPOS grid ratio failure, black kernel alert at 504

Friday, March 8, 2019

VSF FINAL (INT to EXT) operational, 310 reactivated, PT intersection failure

Monday, March 4, 2019

Sunday, March 3, 2019

Abort Project 310; loop closure and exit

Saturday, March 2, 2019

Command immediate ASCOM / LSIP intervention into 310 conversion sequence

Friday, March 1, 2019

STATE OF MISSION REPORT FEBRUARY 2019

Pandora / GCOM in progress, P501 in progress. ANNABELLA operational, rootkit removal in progress with several drastic security breaches including internal YXR flow disruption, deflection in progress. PB status improvement. RRR10. Minimum M / HP requirements met, VTXPOS requirements not met.