Showing posts sorted by relevance for query project 501. Sort by date Show all posts
Showing posts sorted by relevance for query project 501. Sort by date Show all posts

Saturday, August 3, 2019

Project 501 Update

VTXPOS requirements are strictly enforced, leading to n=5. Surface filtering complete, FLT.exe flow active.

INT YXR flow recovery almost complete, ANT INT multiphasic interference almost removed, surface GDS coding partial recovery.
  
Projects 310 and 061 integrated into project 501. 

All 501 protocols are nearing completion, 501/MASTERPIECE integration delayed due to unfavorable grid ratio, PT intersection on hold.

Evaluation expected 190921.

Sunday, June 2, 2019

Project 501 Update

VTXPOS requirements are more strictly enforced, total surface scanning and filtering in progress, limiting towards full INT YXR flow recovery. 

Projects 310 integrated into project 501, project 061 in progress. DL niche almost complete AN integration, AN INT multiphasic interference clearing in progress. 
 
Surface GDS coding complete failure / collapse, abort project except for VTXC, surface triangulation almost non existent.
 
PT intersection on hold.
 
Evaluation expected 190715. 

Wednesday, September 25, 2019

Project 501 Update

All protocols clear and operational, 501/MASTERPIECE integration set at ST point. 

INT YXR flow recovery almost complete, except for recent VTXC disruption which modifies YXR protocols (VTX.1 downgrade).

Project 310 aborted and project 061 downgraded due to unfavorable grid ratio.

Reactivate PT intersection protocols after ST point. 

End of coding for 501.

Wednesday, August 1, 2018

Project 501 Update

All EXHVBN hyperphasic activity has collapsed, except for a brief mid-July peak.

Full gamma focus, P501 link confirmed, exit sequence in completion, project 501 in final phase.

PHOENIX KEYHOLE almost ready. 

Sunday, March 31, 2019

Project 501 Update

LSIP BNF ANNABELLA.exe v1.3 is fully operational and stable.

Interferences into INT YXR and GBN flow, PT intersection failure, recovery in progress. Project 310 minimum requirements met, Project 061 activated. SEP non-local overconversion!

Minimum hyperphase requirements are finalized at PHI 1.5-3.5, P>0.8, THETA>0.8, VTXPOS>1.8.

Conversion streams are finalized into VSF FINAL: 3SD/MOO/DL niche.

P501 sleeper grid activation requested.

All systems are GO until final completion.

Evaluation expected 190425. 

Saturday, June 1, 2019

STATE OF MISSION REPORT MAY 2019

EXMOSS Pandora sequence in progress, TOP EGG deflected. Internal YXR flow / multiphasic recovery in progress. VTXPOS requirements fully enforced. Project 310 merged into project 501, project 061 stall. Minimum M / HP requirements met, SD / VTXPOS requirements not met. 

Thursday, January 1, 2015

Opening of the Box


I have been contacted by a certain benefactor who is willing to donate considerable funds to sponsor projects that are supporting the Lightworkers and Light forces as we are approaching the planetary liberation. This charitable account is an ongoing fund to provide humanitarian aid and financial support where the need is the greatest.



  
Funds can be given ONLY to 501 (c) (3) organizations, registered within the US, preferably to a specific charitable or scientific project. 
 
These funds are NOT part of the collateral accounts, are NOT part of the Reset process and may or may not be connected with the Dragon sources. 
 
If you own a 501 (c) (3) organization and have projects that need funding, you can send an email with a clear and concise description of your project (1000 words maximum) to cobraresistance@gmail.com. All email requests for donations from non-501 (c) (3)  sources will be deleted without being read. From all propositions received, a few projects will be selected for funding according to the Resistance Movement protocols and guidelines to achieve the maximum positive effect on humanity. 
 

Saturday, February 12, 2022

Ascension Plan Update

Time has come to release the next portion of the Ascension plan for this planet.

Some intel about the Ascension plan was already released in a previous update:

http://2012portal.blogspot.com/2016/03/the-ascension-plan.html

Since then, the Plan has evolved and new intel was given by the Light Forces.

Most importantly, the Light forces have communicated that the Ascension window of 1975-2025 will NOT close in 2025, but will remain PERMANENTLY OPEN. This means that energies will keep increasing and since 2025, the Ascension energies will forever permanently flow from the Galactic Central Sun through our Solar System towards the planetary surface.

The Light forces have refused to comment what that means practically for the timing of the Event. Based on the intel I have, I can make an educated guess and speculate for two possible scenarios. The first scenario predicts the Event in 3-15 months timeframe from now and then a fast transformation of the surface human society until the Galactic Pulse in 2025. The second scenario predicts the Event in 2025 and the Galactic Pulse a few years later, but earlier than 2030. Be aware that these dates are just speculations and may be wrong, since they were not directly confirmed by the Light forces.

Also very importantly, there was a substantial change to the Ascension plan when Project 501 collapsed in the summer of 2019. It then became absolutely clear to the Light forces that surface humanity will not be able to undergo healing and liberation without direct physical intervention, and that surface society will have to go through a slow collapse until direct intervention can be safely introduced without dark forces destroying the planet. Therefore the original plan with three Ascension waves between the Event and the Galactic Superwave was too ambitious and had to be revised. So here is the revised Ascension plan.

First, the increased energy from the Galactic Central Sun will continue to purify all the remaining quantum and subquantum anomaly around the planet and beyond, and the Light forces will keep removing all negative non-physical entities. Some quite reliable clues about the removal of various aspects of the primary anomaly can be found here:

https://ascendliberation.blogspot.com/2022/01/current-anomaly-questions-assistance.html

Second, the solar activity will keep increasing, as we are coming closer and closer to the solar maximum of solar cycle 25. Early predictions were estimating that cycle to peak in July 2025, but now scientists are expecting the solar maximum in late 2024:

 


Early research of Alexander Tchijevsky has shown that 60% of all social unrest happens within a year and a half of each solar maximum:

http://time-price-research-astrofin.blogspot.com/2012/03/alexander-tchijevskys-physical-factors.html

http://www.gorbanev.com/Chizhevsky.htm

Therefore we can expect monumental societal changes between early 2023 and early 2026, that is a year and a half of the current solar maximum of solar cycle 25:
 

 


This coincides perfectly with Portal 2025:

http://2012portal.blogspot.com/2020/05/portal-2025.html

And with prophecy of Beinsa Douno:

https://mauihawaiitheworld.wordpress.com/2015/08/03/the-prophecy-of-christian-mystic-master-beinsa-douno/

All negative timelines will collapse and all timelines will converge into the Event:

https://humansbefree.com/2021/11/project-looking-glass-insider-mankind-eventually-wins.html

At the time of peak social unrest and with enough anomaly removed, the Light forces will upgrade the current state of emergency for the surface of the planet into martial law.

This practically means that the whole surface population will undergo a brief (3-7 days) military lockdown during which the mass arrests will be taking place. People will be instructed to strictly stay at home to ensure the safety of military operations without collateral damage. Positive forces will be using quantum pulse weapons to block the weaponry of the Negative military and to freeze the troops and civilians who will refuse to obey the orders of the Positive military.

There is still a large aspect of the Event plan that needs to stay classified and will be a big surprise almost to everybody.

After the Event, the surface society will undergo a drastic transformation that will take a few years.

General surface population will keep integrating intel about Exposure and Disclosure that will be released through the mass media, and begin to heal their deep psychological wounds from the dark past.

While the most extreme psychopaths and sociopaths will be removed from the surface of the planet at the Event and shortly after, many latent sociopaths will remain in the society until the Galactic Superwave and keep a low profile without causing any harm, knowing that any harmful action would trigger their swift removal.

It takes quite a long time to completely purge a system:

https://www.rt.com/news/540662-nazis-germany-prosecutor-office-inquiry/

After the Event, the vast majority of Lightworkers will go through a massive healing process with much assistance from positive energies, angels and Light forces. There is a lot of self-healing work that needs to be done, and it is expected that a few years later when the Galactic Pulse arrives, about 2000 people will be ready to Ascend in the first wave of Ascension which will coincide with the Galactic Superwave and the planetary Evacuation:

https://www.youtube.com/channel/UCh3JFQND70lnAPhb4c8VppQ/videos

https://www.youtube.com/watch?v=nK6k585w784

Those preparing to Ascend in the first wave will be living in Islands of Light, which will begin to be formed shortly after the Event.

They will connect with their twin souls, many of them being on the motherships:

https://intergalacticmatch.com/

They will expand their horizons beyond past programming and start forming Soul relationships:

https://www.welovefirstcontact.com/2022/01/pleiadian-energetic-clarification-of.html

During the Evacuation, the ships of the Ashtar Command and the Galactic Confederation will rescue the surface humanity from the Galactic Tsunami:

https://archive.org/details/TheAdamAndEveStory_201904/page/n187/mode/2up

https://www.luisprada.com/galactic_federation_fleets/

 


After the Evacuation and after the Earth goes through its transformation, only beings fully aligned with Light (estimated about a few million Lightworkers) will be allowed to return and reinhabit the Earth in Islands of Light and prepare for the second and third wave of Ascension which will happen relatively soon afterwards.

The mass of humanity will be evacuated in their physical bodies just before the Galactic Pulse and transported to the planet in the Pleiades star system which already inhabits about 70 billion humans which were evacuated from the astral plane of planet Earth in 1999.

 


About 500 million of surface evacuees, mostly sociopaths and psychopaths and many of them Dracos and Reptilians who came to Earth in 1996-1999 period and were living since then in human clones on the surface, will not be able to fulfill the minimum criteria for evolution and will be taken to the Central Sun for restructuring.

This effectively means the end of darkness and suffering for the whole universe, and a “new cycle of luminosity can begin”.

Victory of the Light!


Tuesday, October 1, 2019

STATE OF MISSION REPORT SEPTEMBER 2019

EXMOSS clear clear, MOSS Pandora sequence in progress. Project 061 downgraded, project 501 to merge into MASTERPIECE at ST point. VTXC systems security breach, in deflection. Minimum M / DL / HP / VTX requirements met, SD requirements not met.

Saturday, April 27, 2019

Project 501 Update

Since ANNABELLA.exe, minimum hyperphase requirements and conversion streams are all finalized and stable, their status will not be reported in future updates unless necessary.

VTXPOS requirements are more strictly enforced, limiting towards full INT YXR flow recovery. 

Projects 310 and 061 in progress. DL niche in progress. Surface GDS coding fully enforced.

SD kernel clearing in progress with some AN INT multiphasic interference, surface grid ratio does not support full SD sequencing until expected 20.2. 

PT intersection on hold, P501 sleeper grid activation failure. 

Evaluation expected 190527.



Saturday, November 2, 2019

STATE OF MISSION REPORT OCTOBER 2019

MOSS Pandora sequence in progress, project 501 to merge into MASTERPIECE at ST point. VTXC systems security breach, in deflection, brief RM2m L0 MASTERPIECE sequence prevented L0 collapse. Minimum M / DL / HP requirements met, VTX and SD requirements not met.

Monday, July 1, 2019

STATE OF MISSION REPORT JUNE 2019

EXMOSS Pandora sequence in progress, cosmic rootkit detected, removal in progress, N22 detected, removal in progress. Project 501 final integration into MASTERPIECE in progress, internal YXR flow / multiphasic recovery in progress, PB recovery failure. Minimum M / HP / VTX requirements met, SD requirements not met. 

Saturday, October 5, 2013

Project 501 Update

Alpha timeline with HVBN until intersection has a probability of p=0.8. The alternative beta timeline with multiple MVBNs, converging into possible next HVBN before intersection has a probability of p=0.2.
 
Beta strategies have been modulated and need to remain strictly classified.
 
There are two major intersection probability peaks remaining.

The previous intersection probability peak within RR2-3 intermediate period has collapsed due to incomplete intel about L1 and L0 anomaly.
 
The first major intersection probability peak comes shortly after the beginning of the RR3-4 intermediate period, p=0.3. Alpha timeline is partially classified P501 with gradual to fast M increase and with probability of some form of EL contact. This leads to complex interference with existing HVBN on the surface, multiple MVBNs being one triangulation alternative and time compression into the convergence point being another one. Shortly before the omega convergence point this timeline anyway converges into an antarionid RM intersection. Beta timeline comes with declassified P501 with multiple MVBNs and then with RM intersections as soon as possible.
 
The second major intersection probability peak comes close to omega convergence point with an antarionid RM intersection, p=0.7. Alpha and beta timelines converge into one as we limit towards the omega convergence point.
  

Sunday, May 4, 2014

Project 501 Update


Alpha timeline with HVBN until intersection has an increasing probability of p=0.9. Alternative beta timeline with sporadic YXRs, converging into possible LEVSF pivoting to next HVBN before intersection, has a decreasing probability of p=0.1 due to increased grid ratio.
 
Beta strategies have been modulated. 
 
Intersection probability peak comes close to omega convergence point with an antarionid RM intersection which includes P501 and all hyperphasic intersections in the optimal sequence order. Alpha and beta timelines converge into one as we limit towards the omega convergence point.
 

Tuesday, March 26, 2019

Project 501 update expected 190331, SD grid recovery in progress

Friday, March 22, 2019

Evaluate SD2 surface target, preAN beta loop recovery, Project 501 update expected 190324

Sunday, June 3, 2018

Project 501 update

Beta timeline is metastable with stabilizing HVBN which is GBN unresolved. Hyperphasic grid is thus potentially activated but shows eclipsed activity flux. Surface R grid shows indicators of collapse. Internal YXR flow is almost recovered.

Suggested GBNF security patch indicates theta below 0.85 for VTXPOS <2.0 for HVBN / Y triangulation.
 
LJVTX LOC aborted due to unfavorable grid ratio.

Sunday, July 1, 2018

Project 501 update

Beta timeline has collapsed, gamma timeline active.

GBN systems have collapsed, all VTXC surface activity is on standby, HVBN active, backup protocol modulated.

PHX refocus complete, exit sequence in progress.

Friday, February 1, 2019

STATE OF MISSION REPORT JANUARY 2019

Pandora/GCOM in progress, P501 in progress. LSIP BNF ANNABELLA.exe operational, rootkit removal in progress. ECL2 GR+, total APR sequence in progress, to be evaluated in next Project 501 update at RRR10. Minimum M requirements met, minimum HP requirements not met.

Tuesday, May 1, 2018

Project 501 update

Beta timeline with sporadic HV YXRs is secured (GBNF+, n=2), with hyperphasic grid activated. Internal YXR flow recovery is in progress.

HVBN intersection (PHI 3.2, P 0.90, THETA 0.83, VTXPOS 2.0) is unstable and requires GBNF security patch application, time calibrated with integration curve and triangulated with other YXRs / HVBNs.

LJVTX protocols in execution, LOC security patch required.