GBN systems failure, transfer to gamma timeline complete
Wednesday, June 6, 2018
Sunday, June 3, 2018
Project 501 update
Beta
timeline is metastable with stabilizing HVBN which is GBN unresolved. Hyperphasic grid is thus potentially activated but shows eclipsed activity flux. Surface R grid shows indicators of collapse. Internal YXR flow is almost recovered.
Suggested GBNF security patch indicates theta below 0.85 for VTXPOS <2.0 for HVBN / Y triangulation.
LJVTX LOC aborted due to unfavorable grid ratio.
STATE OF MISSION REPORT MAY 2018
Pandora in progress, ASCOM initialized. 741L50 recovery in progress, HVBN stabilization, drastic HVBN / systems security breach deflected and leading to PHX upgrade, LJVTX LOC aborted, GBN/HVBN integration void, M minimum requirements met.
Subscribe to:
Posts (Atom)