Showing posts sorted by date for query exmoss. Sort by relevance Show all posts
Showing posts sorted by date for query exmoss. Sort by relevance Show all posts

Thursday, September 5, 2024

Thursday, January 2, 2020

STATE OF MISSION REPORT 2019

Cobra in progress, Pandora in progress, EXMOSS clear clear. Gamma timeline in progress, P501 surface filtering completed with partial grid ratio failure, leading to L0 systemic collapse expected in 20.  MASTERPIECE operational, M minimum requirements met, HP requirements met, SD/VTX requirements not met.

Tuesday, October 1, 2019

STATE OF MISSION REPORT SEPTEMBER 2019

EXMOSS clear clear, MOSS Pandora sequence in progress. Project 061 downgraded, project 501 to merge into MASTERPIECE at ST point. VTXC systems security breach, in deflection. Minimum M / DL / HP / VTX requirements met, SD requirements not met.

Saturday, September 21, 2019

VTXC systems security breach at 504, EXMOSS clear clear, MOSS 08/10 sequence in progress

Sunday, September 1, 2019

STATE OF MISSION REPORT AUGUST 2019

EXMOSS Pandora sequence in progress. Project 310 total abort due to security breach, systems security breach recovery in progress. Minimum M / HP / VTX requirements met, SD requirements not met, DL requirements not met. 

Thursday, August 1, 2019

STATE OF MISSION REPORT JULY 2019

EXMOSS Pandora sequence in progress, N22 downgraded to N20. Project 501 final integration into MASTERPIECE delayed due to unfavorable grid ratio, internal YXR flow / multiphasic recovery (n=3) almost complete. Drastic VTXC/Systems security breach, recovery in progress, PB recovery failure. Minimum M / HP / VTX requirements met, SD requirements not met. 

Monday, July 1, 2019

STATE OF MISSION REPORT JUNE 2019

EXMOSS Pandora sequence in progress, cosmic rootkit detected, removal in progress, N22 detected, removal in progress. Project 501 final integration into MASTERPIECE in progress, internal YXR flow / multiphasic recovery in progress, PB recovery failure. Minimum M / HP / VTX requirements met, SD requirements not met. 

Saturday, June 1, 2019

STATE OF MISSION REPORT MAY 2019

EXMOSS Pandora sequence in progress, TOP EGG deflected. Internal YXR flow / multiphasic recovery in progress. VTXPOS requirements fully enforced. Project 310 merged into project 501, project 061 stall. Minimum M / HP requirements met, SD / VTXPOS requirements not met. 

Monday, May 20, 2019

Thursday, November 22, 2018

EXMOSS/MOSS/L WONDERLAND sequence reactivated, evaluate IS:IS

Friday, September 28, 2018

Monday, September 24, 2018

EXMOSS section1 fleet activated, VTX realignment in position

Friday, September 21, 2018

Monday, January 2, 2017

STATE OF MISSION REPORT 2016

Cobra in progress, Pandora in progress, multiple EXMOSS / EELA / ZEOLITE sequences in progress, BIOCHIP layer removal in progress, U96 / TOPAZ activated, ATLANTIS12  clear. Several systems / Isidic security breaches, all deflected, HVBN unstable towards stable. Two PB removal attempts with results pending. M minimum requirements met.

Friday, December 30, 2016

Monday, September 26, 2016

Wednesday, August 3, 2016

STATE OF MISSION REPORT JULY 2016

Pandora in progress, EELA in progress, EXMOSS primary sequence complete. HVBN unstable to stable. M=82, Midas package.

Wednesday, July 6, 2016

Friday, July 1, 2016

STATE OF MISSION REPORT JUNE 2016

Pandora in progress, EELA in progress, EXMOSS primary sequence in progress. HVBN substable to stable. M=34, Midas package.